无码一区二区三区,午夜精品国产精品大乳美女,欧美偷窥清纯综合图区,日本在高清av手机

Shandong Water Conservancy Construction Group Co.,Ltd
Chinese
English
Contact Us  
Tel:+86 0537-2270579
Fax:+86 0537-2270579
E-mail:[email protected]
News
 

Accelerating progress mobilization meeting in the flood season held By SDWP international company at DESWSP project in Bangladesh

                                                                                             2019-07-19


On July 8, the Bangladesh DESWSP project of SDWP international company held an accelerating progress mobilization meeting in the flood season. The meeting centered on the analysis and summary of the problems existing in the construction process at the present stage, proposition of solutions, clarification of the importance,management ideas and the emergency work task in flood season to guaranteed the construction progress.

The meeting analyzed and summarized the construction of the project cofferdam, the filling of the construction area and the management of the local labor, and put forward the following requirements for the next stage of the project management: Firstly, it is necessary to strengthen the labor management system, strictly manage the temporary local labor during the emergency period, strengthen communication and coordination among various departments and teams, feedback and communicate problems in time, and solve them in a timely manner. Secondly, it is necessary to improve the importance of safety management in the construction, especially for the site construction personnel who must wear safety hats, safety shoes and other labor protection appliances, for putting up a conspicuous warning sign at the location of the hidden danger; thirdly, each construction group is required not to stop work during the rainy season, overtime to ensure the construction progress of the project.

The meeting stressed that under the current political situation in Bangladesh, it is necessary to strengthen the safety and civilized construction and standardized construction of the project, strengthen the safety measures for projects in flood season, strengthen the monitoring of rain and water conditions, make good emergency plans, and ensure the safety of construction personnel.




Link

Copyright  Shandong Water Conservancy Construction Group Co.,Ltd
Add:No. Ten East Road, 33399 Shuifa tower, Ji'nan (The intersection of ten East Road and Tang Ye Xi Road)    Tel:+86 0531 80876106    E-mail:[email protected]
<bdo id="lrd44"><rt id="lrd44"></rt></bdo>
      <bdo id="lrd44"></bdo>
      <menu id="lrd44"></menu>
      <pre id="lrd44"><li id="lrd44"><code id="lrd44"></code></li></pre>

      1. <menu id="lrd44"><dl id="lrd44"></dl></menu>
        主站蜘蛛池模板: 旺苍县| 治县。| 沙河市| 会宁县| 兴仁县| 宜君县| 佛山市| 深圳市| 竹山县| 辽中县| 丘北县| 辽中县| 兴国县| 徐水县| 电白县| 岐山县| 图木舒克市| 安岳县| 西青区| 雷州市| 龙江县| 乌恰县| 大荔县| 许昌市| 二连浩特市| 陆河县| 老河口市| 文昌市| 新巴尔虎左旗| 和政县| 公安县| 延川县| 晋州市| 油尖旺区| 阳新县| 洛浦县| 五家渠市| 马龙县| 宁明县| 潮州市| 鄂尔多斯市|